Our view of the construction site has changed dramatically in the past thirty days. The steel structure for the classroom building is taking shape and we will see the steel for the multipurpose building going up shortly. Also, the block structure to support the stairways and elevator shaft is underway, as is the second level floor.
It is great to move from conceptual design to concrete and steel structure.
|
|
 |